Arabians Re-engineering a Business Process Introduction All organizations are faced with periods of evolution and revolution. As they prepare for a period of change, there will undoubtedly be immense upheaval.

Within this environment of ‘chaos,’ It is important to examine the concerns of Individuals and to constantly evaluate the effects of the changes. For this to happen, ‘organizational diagnosis’ should become an ongoing part of development. Analyzing the results of the diagnosis provides the raw materials for a change strategy.

We Will Write a Custom Case Study Specifically
For You For Only $13.90/page!


order now

Changes are then dad and their impact measured and evaluated. These changes can then be fine- tuned. Tom Peters has written widely about the processes of change.

Much of his work centers upon how patterns change over time. In a recent paper, he pointed out that many developments, such as re-engineering, are based upon perpetual revolution and re-invention. This emphasizes that change is a cyclical process In which organizations – R Grins & Company Limited The DRP Martens Air Cushion Sole was developed in post-war Munich for orthopedic shoes by DRP Klaus Martens.

With his partner, DRP Herbert Funk, they patented the oleos which became the top sellers In the comfort shoe market in Germany. In 1959, they decided to find a company to produce their soles for other countries.

They selected a company in the village of Williston in Impressionistic – R Grins & Company Limited Grins, founded at the turn of the century, was already a manufacturer of army and work-wear boots with a bias towards comfort. It began to make footwear with the DRP.

Martens sole, which It branded Alular and the Group’s success in selling the shoes led the partners to license Grins to make the sole for the rest of the world. Today, DRP. Martens is one of the world’s best known brands and is manufactured and sold to distributors in over 70 countries. The Group employs over 3,000 staff working from In excess of 40 manufacturing sites.

Re-structuring During 1994, the main board of R Grins Group Ltd decided that a major re- structuring of its shoe making business should take place.

Its aim was to Improve control over its operational and selling activities across the world. Difficulties had arisen due to the popularity of the brand which far exceeded the Group’s manufacturing capabilities. This re-organization, which took place in April 1995, exulted In the consolidation of all manufacturing companies under the name of ‘R Grins & Company Limited’ with all of the sales and distribution being controlled by ‘Airway Limited. ‘ This case study focuses on the follow-up to this major upheaval.

OFF At an operational review In August AY, a report snowed Tanat considerable confusion had followed the reorganization. Key issues included: * unclear boundaries between managers and departments * inadequate systems and the absence of meaningful management information * lack of encouragement for local management to take ownership of issues under their intro * lack of visibility of the number of orders and the available production capacity. Operational review An operational review took place after the major re-organization.

Although it identified the main objectives of the re-organization had been met, the review showed serious problems within business processes at operational levels, such as adverse effects on customer service, staff morale and general management control. Re-structuring was always going to be a challenge for the R Grins Company.

In a constantly changing environment, it was important to develop the business so that products would be delivered on time. If it failed to deliver on time, the Company could lose business, despite the massive popularity of the brand.

The Company’s new target markets demanded flexibility and speedy response – Just-in-time supply (I. E. Goods produced and delivered Just in time to be sold).

Such a system had to be geared to response. This required state-of-the-art information systems so that promises made to large retailers could be fulfilled. It was, therefore, necessary to link all parts of the business process, irrespective of the size of the operation, at all levels, thus allowing data collection and evaluation. Technology was a key element of the process re-engineering, as it allowed the R Grins Company to improve its organization and its response.

Following the organizational review, it was vital to ensure that information technology was working to the best commercial advantage of the Group. Senior Management’s major concerns were: * centralization * late deliveries * order process reporting * supply chain management * production and capacity planning.

Centralization Centralization is the allocation of the major responsibilities of an organization to a central headquarters whilst avoiding central domination. Staff morale was affected when the restructuring took place as there was a feeling of lost customer contact and self-determination.

It was felt that the headquarters would hand out instructions to ten workforce won wool a nave to cope wilt unachievable workloads Ana layover schedules. Management soon recognizes that it was necessary to re-establish the team spirit which had helped the business in the past, by creating a sense of empowerment. This would make individuals more active in their organization and encourage use of initiative.

Motivated, committed and well trained people at all levels re needed to bring about successful changes.

It was, therefore, important to empower individuals within the critical chain of order processing, manufacturing and dispatch. Local management teams also needed to focus upon issues such as meeting delivery schedules and stock/inventory control. In fashion markets, products have short product life cycles. The Grins Group needed to identify ways of responding to fashion products with short product life cycles in a way which would not leave them with large stocks of finished goods. Some distributors felt the number of orders completed on time was unsatisfactory.

They also felt that Grins could not be relied upon to discuss problems relating to capacity, what could be made and for when. Grins needed to engage pro-actively with customers and not simply take orders which could not be achieved. A number of distributors commented: ‘we don’t want a progress report, we Just want our shoes. ‘ However, there were several fundamental flaws in Grins’ current systems. Production schedules were not put into place until materials or imported uppers had been received and even if orders were well in advance, delivery dates were not due until 2 weeks before their arrival.

This made it difficult for production capacity planning. At the same time, orders were difficult to trace once production had started. Orders could disappear from monitoring processes for 2 months or more. There was a clear need to install interactive production planning and scheduling computer systems which could track and monitor an order against a plan. Supply chain management This system was outside the control of computer systems and was also in urgent need of support. As Grins was constantly behind with its order book, it was difficult to appreciate the size of the problem.

For example, if the backlog f orders was cleared, there would then be shortages of materials to make shoes. A Materials Requirement Planning (MR.) system was needed to enable Grins to take control of its supply chain. The aim of the MR. system was to provide a better way of managing diverse raw materials feeding many production sites.

It was also necessary to look at stock holding policies so that the most efficient stock profile could be established together with new policies and practices for order management.

Production / capacity planning Production capacity is what can be produced over a 39 hour week. Without a landing or scheduling system, it was impossible for Grins to plan production efficiently. Staff were often losing customer orders until the first stage of production. Occasionally, urgent deliveries were rushed through as priority Jobs.

A production planning [scheduling system would help Grins to gain control over the order book and work in progress. The Review highlighted that systems were completely inadequate for the purpose of change.

I nerve was a clear need to develop a Management International system to improve the control of the order book and deal with the production planning process. DRP. Martens’ strong brand image provides Grins with a platform for substantial growth. Without reengineering the business processes, capitalizing on the brand name would be impossible.

The way forward was to create a suitable fully integrated system to provide a sound basis for management control and performance measurement, not only of its own operation, but also that of its suppliers, distributors and product sales. Performance Grins began implementing the report’s recommendations. The area which required the most urgent attention was that of late deliveries for customers. The major cause f poor delivery performance was the mismatch between sales and production capacity. (I. E.

The amount of sales made and the ability to meet these sales. ) Between June 1995 and December 1996, a number of actions were taken to improve the situation. In June 1995, only 55% of orders were delivered on time. This continued to worsen through August where it reached 47% and finally bottomed out at 45% in September.

This poor performance was due to making more sales than production capacity. It was pointless at this stage to continue taking orders and making delivery promises which could not be achieved in the short-term.

This meant that either production capacity would have to be increased dramatically or the number of orders would have to be held in line with capacity for each month. A decision was taken to ensure that orders taken would reflect the capacity for each month promised. This immediately improved the quality of service drastically from 45% in September to 67% in October and 84% in November.

Throughout 1996, further improvements were made to achieve 86% in January 1996, with a remarkable 99% in December 1996. The planning department In order to ensure that re-engineering was successful, the right quantity and mix had o be established to match the order book to customers’ requirements. At the same time, it was important to establish an order routing system which would take account of the different capacities of the individual manufacturing plants.

This would provide local manufacturing plants with an order portfolio to match their capabilities.

Discussion and negotiation helped to establish how deliveries could be rescheduled. Two significant steps were taken: * The order intake for September 1995 was frozen, allowing manufacturing to clear the backlog in areas with restricted capabilities. The available capacity mix was made known to the sales organization. This helped provide a clear picture of possible supplies and any necessary adjustments to order intake and capacity.

The next step was to implement the electronic planning tool, ‘Autopen,’ which came on line on 17 May 1996.

This further improved control over capacity, work in progress and strengthened communication links to sales. The ownership of order processing and production control was passed to local planning offices where control of order processing and work in progress were further strengthened. In a fast moving environment, an electronic Teacake loop allows a Taster overview AT operational activities. With the new tools of management in place, Sales, Central Planning, Supplies and Local Planning were best positioned to react to situations around them and to take advantage of the opportunities they presented.

Spreading risk Rather than have one key sub-plan site with 60% of the group production capacity, it was decided to spread the risk and liability of production scheduling equally across 8 Sub-Plan offices.

This reduced risk by spreading the volume over separate locations and computer systems. Under the old structure, it was difficult for staff to understand the wider planning function. Staff training was, therefore, carried out to create a better understanding of the common goals and objectives for the planning process.

March 1996 To shorten manufacturing lead-times, customer orders were shown with the manufacturing site and the sub-plan office. This resulted in the ability to rough-cut plan orders immediately on their receipt, rather than wait for an expert to manually allocate them.

In some cases, this reduced the time taken for an order to get from order intake to manufacturing site from months down to one week. April 1996 The availability of on-site manufacturing equipment determines the appropriate plant for production.

A computer model was built which replicated decision making parameters and took into account the location and capacity of each plant. From this, it was possible to introduce Autopen into the equation. May 1996 The time taken to process an order was then dramatically reduced.

Once the orders were received by the Sales Department, they were put into the system and scheduled within 5 days. August 1996 Implementing Autopen across all sites enabled Grins to identify upper sites in the I-J, the Far East or South America.

Pre-determining the location of the upper source helps to improve the control of work in progress and lead performance world-wide. January 1997 As a result of the implementation of the system improvements, Grins achieved both a significant improvement in both customer-service levels and lead-time performance. This was further improved by the introduction of a link between Sales and Manufacturing businesses, enabling the electronic transmission of orders to further reduce time and eliminate any inputting errors. Conclusion All organizations make plans which are designed to fulfill their business objectives.

These plans will usually depend upon the nature of the operation, the capacity, the required level AT customer service, ten time pergola Ana ten organization’s nope Tort the future. The positive steps taken by Grins to re-engineer its business processes, have enabled significant improvements in performance by reducing lead-time from in excess of 18 weeks to below 12 weeks over a six month period. Grins has full control over work in progress and is able to provide feedback (such as progress of order to customers on a weekly basis). Grins now has an accurate forecast of aspects date.

This case study shows that planning is an ongoing process of continuous improvement. Where changes take place, it is important to evaluate performance so that further modifications can be carried out where necessary.

Over the last 12 months, production at Grins has increased by a staggering 20. 25%. With the new changes and systems in place, the company has forecasted an increased volume in excess of 40%, based on the 1995/6 fugues, for 1997/8. Reference: http://fastidiousness’s. Co. UK/DRP-martens/re-engineering-a-business- process/conclusion.